Prevention Plan Unit – Gravelines Power Plant

Prevention Plan Unit – Gravelines Power Plant

The Gravelines Nuclear Power Plant (CNPE) commissioned CERAP Prévention to manage the Prevention Plan Unit, ensuring real-time administrative updates and a strong on-site presence.

1516 on-site safety visits during outages – per year 1589 on-site safety visits during maintenance periods – per year 1189 site inspections on major projects
CERAP Prévention
X

Description

Key figures

  • 1,516 on-site safety visits during outages (AT) – per year

  • 1,589 on-site safety visits during maintenance periods (TEM) – per year

  • 1,189 site inspections on major projects

 

Objectives

  • Ensure compliance with the regulatory framework defined by the Decree of 19 February 1992 and the Decree of 26 December 1994, covering all interventions during both operating and outage periods, as well as on large-scale industrial projects (Grand Carénage and Post-Fukushima programmes).

  • Manage the Prevention Plan Unit, combining real-time administrative updates with continuous on-site monitoring.

 

Our approach

  • Deployment of dedicated, multidisciplinary experts skilled in conventional safety (all risks), fire safety and radiation protection.

  • A comprehensive management approach offering a single interface for all clients and an adaptive monitoring frequency aligned with project progress.

  • Regulatory monitoring and expert support ensuring continuous compliance.

Similar projects

Design of an underwater measurement system
Characterisation Nuclear Measurement Engineering
CERAP Prévention
X
Design of an underwater measurement system
A trusted partner for high-quality spectrometry solutions, CERAP Prévention designed for Laborelec a waste characterisation system for use in a storage pool, following a series of successful projects completed for Electrabel and EDF.
Operation of an environmental chemistry laboratory
environmental chemistry laboratory
CERAP Prévention
X
Operation of an environmental chemistry laboratory
The CEA Cadarache site has entrusted CERAP Prévention with the operation of its environmental chemistry laboratory.Working on the water cycle, we contribute to ensuring the cleanliness and compliance of liquid discharges into the natural environment.
Radiological and conventional safety monitoring plan
34 worksites 20000 measurements 700 field visits and safety talks
CERAP Prévention
X
Radiological and conventional safety monitoring plan
The Thermal Maintenance Agency (AMT) of EDF has commissioned CERAP Prévention to implement the radiological and conventional safety monitoring plan across the national fleet of nuclear power plants.
Back

They trust us

A question?

Do you have a question or need information about our services? Our sales department is at your disposal !

Contact us !